National Assembly for Wales
The site has a powerful presence, with uninterrupted views over Cardiff Bay. The resulting building, with vistas of sky and water, looks outwards to Wales and beyond.
The election of the Welsh National Assembly in 1999, was a turning point in the history of Wales. Its home, Cardiff’s former docklands, is a striking addition to the local scene and a statement of faith in the regeneration process. The Assembly building embodies democratic values of openness and participation, while its progressive environmental agenda establishes a new standard for public buildings in Britain.
The setting is the Pierhead, once the centre of the coal exporting trade. Nearby are the Grade I listed Pierhead Building and the new Wales Millennium Centre. The idea of openness is exemplified by the transparency of the building. Public spaces are elevated on a slate-clad plinth and cut away to allow daylight to penetrate the administrative spaces at lower level. A light-weight, gently undulating roof shelters both internal and external spaces, pierced by the protruding extension of the Debating Chamber.
A large circular space at the heart of the building, the Chamber is defined by the dramatic roof which is drawn down from the roof above to form the enclosure. The Assembly also includes exhibition and education spaces, a café, committee and meeting rooms, press facilities, offices for the principal officers of the Assembly and a members’ lounge.
The servicing strategy responds to the varying demands of the internal spaces – air-conditioning is supplied in the debating chamber, while the public lobby is naturally ventilated. Heat exchangers capitalise on the potential of the ground as a cooling mechanism, while the thermal mass of the plinth tempers fluctuations in the internal environment. In this way, the design achieves significant energy savings compared to traditional buildings.
Hard landscaping, together with a canopy of trees, creates a close for the Assembly and completes the jigsaw of new development in this part of Cardiff Bay.
Project information:
- Place/Date: Cardiff, Wales 1998 - 2005
- Client: National Assembly for Wales
- Cost: £41 million
- Gross Internal Area: 5,308 m²
- Architect: Richard Rogers Partnership
- Structural Engineer: Arup
- Environmental Consultant: BDSP Partnership
- Project Manager: Schal
- Landscape Architect: Gillespies
- Fire Consultant: Warrington Fire Research
- Acoustic Consultant: Sound Research Laboratories
- Access Consultant: Vin Goodwin Access Consultant
- Broadcasting Consultant: Department Purple
- Wind Engineering Consultant: Arup
- Façade Engineer: Arup
- Bomb Blast Consultant: TPS Consult
Awards
- Civic Trust Award, 2008
- RIBA Award National, 2006
- RIBA Stirling Prize Building of the Year Shortlist, 2006
- Structural Steelwork Design Award, 2006
- Gold Medal in Architecture, National Eisteddfod, 2006
- Natural Stone Award, 2006
--RSHP
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.